Pertamina Geothermal Energy / pge.pertamina.com |
PT Pertamina Geothermal Energy - PGE or referred to as "Pertamina GE" is a leading renewable energy company in Indonesia with main business competencies on geothermal energy utilization. Pertamina GE engaged in exploration and production of steam and electricity generation. Geothermal energy is a thermal energy generated and stored in the Earth. Indonesia has potential pollution-free geothermal energy of 29,038 MWe or equivalent with 40% of world’s potential geothermal energy. PT Pertamina Geothermal Energy is a member of PT Pertamina (Persero) or Pertamina Group, the national oil company of Indonesia. At present, PT Pertamina Geothermal Energy is 90.06% owned by Pertamina Group and 9.94% by PT Pertamina Dana Ventura amounted to 9.94%. Based in Jakarta, Pertamina GE runs its business through 14 Working Areas, 4 Productive Geothermal Areas, and 7 Geothermal Development Projects spread in all over Indonesia (as of December 2015).
In term of financial performance, Pertamina GE managed to record a total operating income of USD119.62 million in the fiscal year 2015. This total operating income equivalent with 111% of the target of USD107.55 million, according to PT Pertamina Geothermal Energy Annual Report 2015 as cited by JobsCDC.com. Referring to its annual report, total comprehensive income in the fiscal year 2015 amounted to USD85.04 million, or 122% of the target of USD69.80 million. Total geothermal steam production equivalent to electricity as much as 3,056.82 GWh, or 7.96% growth as compared with 2,831.40 GWh in 2014.
In term of financial performance, Pertamina GE managed to record a total operating income of USD119.62 million in the fiscal year 2015. This total operating income equivalent with 111% of the target of USD107.55 million, according to PT Pertamina Geothermal Energy Annual Report 2015 as cited by JobsCDC.com. Referring to its annual report, total comprehensive income in the fiscal year 2015 amounted to USD85.04 million, or 122% of the target of USD69.80 million. Total geothermal steam production equivalent to electricity as much as 3,056.82 GWh, or 7.96% growth as compared with 2,831.40 GWh in 2014.
To achieve the company vision, to become world-class geothermal energy company, PT Pertamina Geothermal Energy are looking for qualified candidate to fill the positions:
Analyst Inspection (2/HSE/2017)
Requirements
Requirements
Requirements
Junior Auditor (2/IA/2017)Analyst Inspection (2/HSE/2017)
Requirements
- Minimum S1 Engineering or equivalent.
- At least 10 years experience in the field of Inspection/Quality Control.
- Employment status: Contract Employee / PWT.
- Work Location: Jakarta
- Contract Period: Maximum 2 years of Contract Period.
Requirements
- Minimum S1 Engineering.
- Have expertise certification in Project Management & Business and Risk Management.
- At least 7 years experience project management, especially Construction Project / EPC.
- Have a good knowledge about Managerial and Project Management.
- Have a good knowledge and strategy in project planning and control.
- Employment status: Contract Employee / PWT.
- Work Location: Jakarta.
- Contract Period: Maximum 2 years of Contract Period.
Requirements
- Minimum S1 Economics, Accounting, Law, and Engineering.
- Have Qualified Internal Auditor (QIA) certification or certified Auditor Experts from Government auditing agencies or other equivalent certification.
- At least 10 years experience as Audit Team Leader with relevant work experience.
- Employment status: Contract Employee / PWT.
- Work Location: Jakarta.
- Contract Period: Maximum 2 years of Contract Period.
Requirements
- Minimum S1 Mechanical Engineering, Petroleum Engineering, Civil Engineering.
- Have expertise certification in the field of the profession in accordance with educational background (preferably).
- At least 5 years experience in the field of petroleum, gas and geothermal or Industrial machinery or construction / civil.
- Employment status: Contract Employee / PWT.
- Work Location: Jakarta.
- Contract Period: Maximum 2 years of Contract Period.
Requirements
- Minimum S1 Engineering or equivalent.
- At least 15 years experience in the field of Inspection/Quality Control.
- Employment status: Contract Employee / PWT.
- Work Location: Jakarta.
- Contract Period: Maximum 2 years of Contract Period.
For more detail information on the requirement, please refer official source from PT Pertamina Geothermal Energy on following link below. To apply for, please register directly through Pertamina e-Recruitment website at http://ift.tt/1556oLZ and clicking apply in preferred position. Closing date 9 June 2017. Only candidates that meet the above qualification will be shortlisted. (JobsCDC.com / Source)
from Lowongan Kerja Terbaru Juni 2017 | BUMN CPNS 2017 http://ift.tt/2s7OlVS
via Lowongan Kerja Terbaru PT Pertamina Geothermal Energy - Professional Hire Program Pertamina Group June 2017 - Hallo sahabat Lowongan Kerja Terbaru Bulan Januari 2017, Pada Lowongan yang anda baca kali ini dengan judul PT Pertamina Geothermal Energy - Professional Hire Program Pertamina Group June 2017, kami telah memberikan lowongan terbaru ini dengan baik untuk anda lihat dan ambil informasi didalamnya. mudah-mudahan informasi Lowongan Kerja Terbaru Hari Ini Lowongan Lowongan Kerja Terbaru, Lowongan Lowongan Kerja Terbaru Juni 2017 | BUMN CPNS 2017, yang kami tulis ini dapat anda pahami. baiklah, selamat membaca.
Judul : PT Pertamina Geothermal Energy - Professional Hire Program Pertamina Group June 2017
link : PT Pertamina Geothermal Energy - Professional Hire Program Pertamina Group June 2017
PT Pertamina Geothermal Energy - Professional Hire Program Pertamina Group June 2017
Demikianlah Informasi PT Pertamina Geothermal Energy - Professional Hire Program Pertamina Group June 2017
Sekianlah Informasi PT Pertamina Geothermal Energy - Professional Hire Program Pertamina Group June 2017 kali ini, mudah-mudahan bisa memberi manfaat untuk anda semua.
Anda sekarang membaca Informasi PT Pertamina Geothermal Energy - Professional Hire Program Pertamina Group June 2017 dengan alamat link https://cariloker-dot.blogspot.com/2017/06/pt-pertamina-geothermal-energy.html
Tidak ada komentar:
Posting Komentar